The Radmalls

The Radmalls

Monday, July 14, 2014

Progress...

I love making lists, but even more then making lists I love crossing things off of my lists.  I posted about our spring/summer to do list here and wanted to look at our progress.

Hallway - 75% complete


Remove Swamp Cooler from ceiling and wall
Re-drywall where the swamp cooler was removed
Paint trim and walls (the last of the yellow and green paint)
Add some art and a runner rug


Front Yard - 66% complete


DIY Paver Patio in front of window on the right
Add some landscaping (bushes/flowers/rock)
Paint the front door a fun blue


Master Bathroom - 29% complete


 Paint the hideous vomit colored walls
Replace the off centered circle mirror
Paint the cabinets and get hardware
Spray paint the light fixtures black
Repaint the grout
Paint the outdated tile in the tub and shower
Refinish the ugly tub with a $30 Tub and Tile Kit from Lowes



It has been a lot of work and very tiring so we are officially taking a break.  A much needed break.


No comments:

Post a Comment